Commercial EV Charging Requirements in the UK: A Site Owner's Guide


The rules that apply to your chargers depend on who can use them. Chargers for staff, visitors or fleet vehicles must be smart, wired to BS 7671 and, in new buildings, provided under Part S. Chargers open to the public carry extra duties on pricing, payment, data and reliability. If your site is in a covered car park, you also need a fire risk assessment before installation. Getting the category right at the design stage is the cheapest compliance decision you will make, and it is where we start every project at Swift Charging.
TL;DR
Non-public chargers for cars and vans (workplace, depot, tenant parking) fall under the Smart Charge Points Regulations 2021, in force since 30 June 2022.
Public chargers fall under the Public Charge Point Regulations 2023: published pence-per-kWh pricing, a free 24/7 helpline, open data, roaming and contactless on qualifying units.
New non-residential buildings in England with more than 10 parking spaces need at least one charge point plus cable routes under Part S.
Every installation must meet BS 7671 and the government’s minimum technical specification, which also decides grant eligibility.
Covered car parks need a site-specific fire risk assessment for EV charging before work starts.
Table of Contents
Start with the question that decides everything: who can use the charger?
UK commercial charging rules are not one rulebook. They are three or four, and which apply depends on the type of use.
Charger use | Main rules | What it means in practice |
Workplace, staff and visitors | Smart Charge Points Regulations 2021, BS 7671, technical specification if grant-funded | Smart functions, security standards, safe electrical design |
Fleet and depot | Same as workplace for car and van chargers | Smart functions and load planning around overnight charging |
Tenant or landlord car parks | Smart regulations, Part S for new builds and major renovations | Cable routes and charge points built in from the start |
Open to the public | Public Charge Point Regulations 2023, plus the above | Pricing display, helpline, data, roaming, contactless, reliability |
A business park that lets only tenants and their visitors park is usually in a different position from a hotel car park open to passing drivers. If you are unsure which side of the line you sit on, that is the first thing to settle with your installer, because it changes the hardware, the software and the paperwork. Our public charging and workplace charging teams work from exactly this distinction.
Smart charging rules for workplace and fleet chargers
The Electric Vehicles (Smart Charge Points) Regulations 2021 apply to relevant charge points intended for cars or vans. They exclude public charge points, rapid charge points and non-smart cables, and they came into force on 30 June 2022. A workplace charge point, meaning one intended for use by employees or visitors at a place of employment, is covered. Rapid units of 50kW and above are not.
In plain terms, a charger sold for these uses must be able to:
send and receive data over a communications network;
respond to signals that shift charging away from peak demand (demand side response);
work with other systems (interoperability);
give the user an interface to manage charging.
Government’s own evaluation also records that additional cybersecurity standards became mandatory on 30 December 2022. The regulations place their obligations mainly on those selling charge points in Great Britain, so the official compliance guide is written for suppliers. For you as the site owner, the practical point is simple: buy from a supplier who specifies compliant units, and connect them to management software so the smart features are actually used.
For fleets this matters commercially as well as legally. Depot vehicles usually sit for hours overnight, which is exactly when load management and scheduled charging cut peak demand on your supply. Our fleet charging designs combine chargers with management software and load management for that reason.
Building regulations: Part S and new developments
Part S of the Building Regulations applies in England. The Approved Document S took effect on 15 June 2022. For new non-residential buildings with more than 10 parking spaces, it requires at least one charge point and cable routes for at least one in five of the remaining spaces. The same provisions extend to major renovations of existing buildings that meet the thresholds.
What that means for different readers:
Developers and landlords of new buildings: budget for the charge point and the ducting from day one. Retrofitting cable routes into a finished car park costs far more than laying them during construction.
Owners of existing buildings not being renovated: Part S does not oblige you to install chargers, but tenants, staff and fleet plans often will. Designing ducting and supply capacity for later expansion is sensible.
Managing agents: check the lease position and who pays for supply upgrades before committing, as the electrical supply is often the largest single cost driver.
Scotland, Wales and Northern Ireland set their own building standards, so confirm the local position if your site is outside England.
Planning permission
Many commercial installations can proceed under permitted development rights, but the conditions depend on charger height, equipment housing and how close the unit sits to the highway. Government has been consulting on changes to these rights, covering taller upstands, removing distance restrictions next to the highway and allowing equipment housing for larger chargepoints in non-domestic off-street car parks. The rules have been moving, so have your installer confirm the current position for your exact layout before you order. Listed buildings, conservation areas and sites with existing planning conditions are where surprises tend to appear.
Electrical safety and equipment standards
The government’s commercial chargepoints minimum technical specification, updated on 30 April 2025, sets the baseline that most commercial buyers should work to. Key points:
The final installation must comply with BS 7671 (the IET Wiring Regulations) and follow the recommendations of the IET Code of Practice. Where the documents appear to conflict, BS 7671 takes precedence.
Equipment must meet BS EN 61851.
Equipment must have at least a three-year operational life and on-site warranty.
Workplace installations must display instructions on payment and access where relevant, and on operation.
Chargepoints must meet the specification to be eligible for the Workplace Charging Scheme, and manufacturers must register them with the Office for Zero Emission Vehicles (OZEV).
We cover the engineering side in more depth in our guide to EV charging design standards for UK commercial sites. Because the specification also gates grant funding, choosing hardware that meets it from the start keeps your funding options open.
Site capacity, grid connection and load management
The specification states that the supply to the final installation must allow the equipment to operate at its full rated capacity. Where local constraints prevent that, the equipment is classified by its actual output capacity instead.
That sentence is why a site survey comes before any purchase. Before you order chargers, establish:
Available supply: your existing maximum import capacity and how much headroom the building’s other loads leave.
Charger mix: AC units for staff parked for hours, DC units where vehicles need a fast turnaround.
Number of bays now and in five years: supply upgrades are cheaper done once.
Load management: software that shares available power across all active chargers, so you can add bays without an immediate grid upgrade.
Cable routes and distances: long runs affect cost and voltage drop.
A worked example: an office with 40 bays and a modest spare supply does not need 40 chargers running flat out at once. With load management sharing the available power, it can install more sockets than the supply could support at full output, and staff still end the day with the miles they need. The same logic applies to depots, where vehicles charge in rotation overnight.
Fire safety in covered car parks
If your chargers will sit in a basement, multi-storey or other enclosed car park, the government’s fire safety guidance for covered car parks advises operators and designers to carry out a fire risk assessment specific to EV infrastructure before installation. The aim is to confirm that existing detection, ventilation, suppression and the wider fire strategy are adequate for the new equipment. The guidance dates from 2023 and was updated in 2024. Involve your insurer and building control early, and keep the assessment on file. In an open-air car park the risk profile differs, but a fire risk assessment is still good practice.

Extra rules if your chargers are open to the public
If anyone can use your chargers, the Public Charge Point Regulations 2023 apply. As set out in the government’s guidance, updated 21 October 2024, operators must:
display maximum prices in pence per kWh;
provide a free, staffed helpline open 24 hours a day;
publish accurate machine-readable data in the OCPI format and support roaming;
offer contactless payment on new points of 8kW and above deployed after 24 November 2024, and on existing points of 50kW and above;
keep rapid networks to an average of 99% annual reliability.
The same guidance says that, apart from price transparency, these regulations do not apply to operators that qualify as micro-businesses.
For hotels, leisure sites and landowners, this is the difference between a charger and a service. The helpline, data feeds, payment and reliability duties are why a managed back office matters. We offer public EV charging and options to host chargers on your land or site, including revenue-sharing models where the host does not run the network itself.
Grants and funding: what the requirements mean for eligibility
Grant schemes attach conditions to the hardware and the installation. The Workplace Charging Scheme requires chargepoints to meet the technical specification above, with manufacturer registration with OZEV. Scheme values, eligible organisations and whether the scheme is open to new applications can change, so confirm them on the official GOV.UK page before you commit.
The practical rules of thumb:
Check eligibility before you order, not after. Hardware bought before an application is approved can be ineligible.
Keep the survey, quotes and commissioning records together, as funders ask for evidence.
Choose a supplier who knows the scheme’s current terms.
Our grants eligibility check lets you see whether OZEV funding may apply to your business, and where eligible, we help businesses identify and apply for available government EV charging grants.
A compliance checklist before you sign
Classify the use: workplace, fleet, tenant, or public.
Confirm the building regulations route: Part S for new or renovated English non-residential buildings above the space threshold.
Check planning: permitted development conditions for height, housing and highway proximity.
Survey the supply: capacity, headroom, load management and future expansion.
Specify compliant equipment: smart functions, BS EN 61851, three-year life and warranty.
Design to BS 7671: and the IET Code of Practice.
Assess fire risk: mandatory in practice for covered car parks.
Plan the public-facing duties: pricing, helpline, data, payment and reliability, if open to the public.
Check grant conditions: before ordering.
Set up maintenance and software: so the installation stays compliant and reliable.
Our view: compliance is cheaper when it is designed in
Most compliance problems on commercial sites start with a decision made before anyone looked at the rules: a charger bought before the supply was surveyed, or a car park treated as private when it was open to the public. Our approach is to begin with a feasibility and site assessment, then move through system design, installation, commissioning and long-term management. That sequence exists because the requirements above connect. The supply decides the charger mix, the charger mix decides the software, and the software decides how you meet smart charging and, where relevant, public charge point duties. We design, supply, install and manage commercial charging, so one team is accountable for the whole chain, from grant applications to maintenance. We also offer funded and flexible models, including fully funded installation, full ownership packages, joint investment options and charging as a service, so a compliant site does not have to mean a large upfront bill. If your site needs solar PV, battery storage or heat pumps alongside charging, we can assess those as part of the same plan. Swift Charging
Get a compliant design from the start
If you are planning a new installation, expanding an existing one or replacing outdated chargers, we handle feasibility, design, installation, commissioning and ongoing management across the UK. We can also migrate existing chargers onto a modern management platform and keep them running through our maintenance plans.

Start with a commercial EV feasibility review and we will look at your site, your users and your funding options together.
FAQ
Do I need planning permission to install EV chargers at my business?
Often not, because permitted development rights cover many workplace and non-domestic car park installations. The conditions depend on charger height, equipment housing and distance from the highway, and the rules have been under review. Confirm the current position for your layout before ordering, and always check for listed building or conservation area restrictions.
Do workplace chargers have to be smart?
Yes, for relevant charge points for cars and vans. The Smart Charge Points Regulations 2021 cover workplace charge points and require data connectivity, demand side response, interoperability and a user interface, plus cybersecurity standards. Public and rapid (50kW+) charge points are excluded from those specific rules.
What electrical standard must a commercial installation meet?
BS 7671 governs the final installation, alongside the IET Code of Practice recommendations. Equipment should meet BS EN 61851, with a three-year operational life and on-site warranty under the government’s minimum technical specification, which grant-funded units must also meet.
What extra rules apply if the public can use my chargers?
The Public Charge Point Regulations 2023 apply. These cover maximum pence-per-kWh pricing, a free 24/7 helpline, open data and roaming, contactless on qualifying units and a 99% average reliability target for rapid networks. Micro-businesses are exempt apart from price transparency.
Does Part S force me to install chargers in an existing car park?
Not on its own. In England it applies to new non-residential buildings and major renovations with more than 10 parking spaces, requiring one charge point and cable routes for one in five of the remaining spaces. Existing sites not being renovated have no such obligation, though planning for expansion is wise.
Sources
The Electric Vehicles (Smart Charge Points) Regulations 2021
Complying with the Smart Charge Points Regulations 2021: guidance
Approved Document S: Infrastructure for the charging of electric vehicles
Changes to various permitted development rights for EV charging
Covered car parks: fire safety guidance for electric vehicles