EV Charging in Leases: What UK Landlords and Tenants Should Agree


A commercial lease that says nothing about EV charging leaves both sides guessing: who can install, who pays, who owns the equipment and who clears it away at the end. The practical answer is to settle those points in writing before the first cable is run, and to do it with a site survey in hand so the clauses match what the electrics can actually deliver. At Swift Charging we design, supply, install and manage commercial charging, and we work with landlords, managing agents and occupiers from feasibility through to long-term management, so the lease and the engineering can be agreed together.
TL;DR
Tenant works need landlord consent. In a shared car park, expect the landlord to hold absolute discretion, usually documented through a licence for works and often a lease variation.
A good EV clause covers installation rights, bay allocation, electricity costs, ownership of equipment, maintenance and reinstatement at lease end.
Installation costs are rarely recoverable through the service charge. Running costs may be, depending on the drafting.
Check electrical capacity before agreeing anything: it decides how many bays the lease can promise.
Chargers must meet the GOV.UK commercial chargepoint specification, and England no longer needs planning permission for most installations.
Table of Contents
Why the lease matters before the charger
Most commercial leases were drafted before EV charging was a tenant request. They deal with alterations, common parts, service charge and reinstatement, but not with cables across a car park, a dedicated bay or a metered supply. When a tenant, an employee group or a fleet manager asks for chargers, the existing clauses are stretched to fit.
The result is predictable: slow consent, disputes over who pays for electricity, and unclear obligations at lease end. Solicitors who advise on this recommend that new leases expressly cover future charging points, including allocation of spaces, electricity consumption, cost recovery, ownership of tenant-installed equipment, reinstatement and the right to upgrade as technology develops.

When a tenant needs landlord consent
Under a standard commercial lease, tenant works need landlord approval. Where a tenant has exclusive premises and the works are non-structural, a landlord often cannot unreasonably withhold consent. A shared car park is different: for chargers in a common car park the landlord will most likely have absolute discretion to refuse.
Consent is typically recorded in a licence for works, which gives the tenant and its contractors access. It is often paired with a lease variation adding rights to maintain, use and repair the charge points, provision for extra utility costs, and an option to remove or retain the equipment when the lease ends.
The same advice notes that the tenant proposing the works normally pays the landlord’s and any head landlord’s legal and surveyor’s costs. In a negotiated licence these can be significant and may even exceed the installation cost. Agreeing a scope and a cap on those fees at the outset avoids a nasty surprise.

What the landlord should keep control of
Where a tenant installs and maintains the chargers, the landlord should still deal with the electricity supplier, approve the works and method, and make sure the installation does not invalidate building insurance. Approval of the method protects the power capacity other tenants rely on.
Checks to complete before you draft
Clauses are only as good as the site facts behind them. Before agreeing terms, establish:
Electrical capacity. Existing infrastructure may not be sufficient, and upgrades may be needed for several charge points at a multi-let site. Our guides on EV charging power requirements and fitting more chargers without grid reinforcement explain how load management can stretch a supply.
Cable routes and third-party land. Tenants should speak to the distribution network operator early. Wayleaves or easements may be needed for cable routes, and grid connections crossing adjacent land need third-party consent.
Substation needs. If a new substation is required, network operators usually ask for a 99-year lease, which can clash with occupational leases of 5 to 15 years.
Insurance. The landlord should notify its insurer of the proposed works.
Planning. Since 29 May 2025 most EV charge point installations in England no longer need planning permission under permitted development rights, with exceptions for listed buildings, conservation areas and world heritage sites, plus limits on equipment size and height. Our guide to listed building charger consent covers the exceptions.
A feasibility review handles these checks in one visit. You can ask for a Commercial EV Feasibility Review from us before the heads of terms are fixed.
Who pays for what
Cost allocation is where most lease disagreements start. Three headings need to be explicit.
Installation
A commercial charge point has been quoted at £1,000 to £3,000 plus VAT depending on the model, with cabling, electricity supply and groundworks on top. That is a 2021 figure, so treat it as an order of magnitude and price your own site. A landlord is unlikely to recover high installation costs through the service charge, so the lease should say whether the landlord, the tenant or a third-party operator funds the work.
Electricity
Decide how consumption is metered and charged. Separate metering per charger or per user is simplest to draft. Operating costs may be recoverable through the service charge, depending on how the provisions are written, so check that EV equipment falls within the definition of services.
Maintenance and insurance
Name who maintains the bays, lighting, markings and accessibility features, and who carries insurance for equipment damage and public liability. A pre-contract checklist for leased charging sites lists exactly these points. A maintenance agreement with a defined response and servicing scope gives the lease something concrete to point to: our EV charger maintenance plans come in Basic, Standard and Fully Managed levels.
Clauses a landlord should reserve in occupational leases
If you are installing chargers for the whole building, reserve rights in each tenant’s lease. Landlord-side advice points to the right to temporarily close the car park or obstruct access, vary exclusive parking rights so all tenants can use the chargers, and create rules for charging bays.
The operating model should follow the building. A shopping centre may prefer free but slow charging to keep customers on site longer, while pay-per-use suits offices and residential schemes, as one Weightmans partner observes. Our guides on multi-tenant charging and business park charging with 4 to 8 AC bays show how that works in practice.
Leasing space to a charge point operator
Some landowners do not install at all and lease bays to an operator. Heads of terms should cover:
how power reaches the site;
the rent basis: fixed, turnover or revenue share, or a hybrid;
who carries out and pays for installation, maintenance and grid works;
service charge and utility allocation;
exclusivity against competing chargers;
access rights;
decommissioning and reinstatement, with security such as a bond or parent guarantee in case the operator stops trading.
A 2026 RICS Property Journal article reports that operator leases typically run longer, with rent around £2,000 per annum per charge point rising with inflation, plus an agreed profit share. The same piece notes bespoke clauses such as keeping charge points visible from the public highway, utility continuity agreements, and a covenant against queuing vehicles blocking access roads.
If you would rather earn from your land without running anything yourself, see how we host EV chargers on your land or site.
Upgrades, relocation and the end of the lease
Reinstatement is the clause people forget. Decide at the start whether equipment is removed, left in place or transferred. The Scottish Futures Trust’s draft template lease, a useful model for the structure, allows maintenance and repair on reasonable notice without consent, and upgrades with consent not to be unreasonably withheld. At expiry the tenant yields up the equipment except items the landlord asks to be removed or made safe, makes good any damage and helps transfer the grid connection if asked.
Landlords planning redevelopment may want a “lift and shift” right to require relocation. RICS notes relocation is likely to be at the landlord’s expense, and a landlord-only break with a break fee is an alternative. Where security of tenure applies, the Landlord and Tenant Act 1954 process must be followed.
Technical standards the lease can refer to
Tying the clause to a recognised standard removes argument about quality. GOV.UK’s commercial chargepoint minimum technical specification requires installation to comply with BS 7671, the IET Code of Practice for EV charging equipment installation, the Electricity Safety, Quality and Continuity Regulations 2002 and BS EN 61851. It also asks for a three-year on-site warranty on parts and installation and a minimum three-year operational life, and BS 8300 design for drivers with disabilities. Workplace sites must comply with the Electricity at Work Regulations 1989. Our guide to EV charging design standards walks through them.
Where the rules are heading
In October 2025 the government set out plans to mandate chargepoints in new covered car parks and to strengthen protection against landowners overcharging tenants for home charging. Planning for cross-pavement charging is also being eased. Draft leases with enough flexibility to accept upgrades and changes of operator, and review the wording as these rules settle.
A sensible clause checklist
Topic | What to settle |
Installation rights | Who may install, where, and by what consent route |
Bay allocation | Dedicated, shared or first come first served |
Electricity | Metering, tariff and recovery mechanism |
Ownership | Landlord, tenant or operator, and on forfeiture |
Maintenance | Responsible party and servicing standard |
Insurance | Equipment damage and public liability |
Upgrades | Right to replace or expand as demand grows |
End of term | Removal, retention, make good and security |
How we help with the lease and the site
We survey the site, size the supply, design and install the chargers, then manage them through charging software with payment and RFID options and load management. Where eligible, we also help businesses apply for government charging grants, and we offer funded and charging-as-a-service models that change who carries the capital cost, which in turn shapes the lease clauses. You can start with our workplace EV charging service, or read our landlord legal checklist.

To discuss a site, visit Swift Charging.
Our perspective
The strongest EV clauses we see written down are the ones tied to a real site design. When capacity, bay numbers and metering are fixed first, the lease can be short and specific. We favour an approach where one party manages the whole installation: survey, design, installation, software and maintenance. It gives landlord and tenant a single point of accountability, and it keeps the lease aligned with load management and future expansion. Funding is part of the same conversation. Fully funded, jointly invested and charging-as-a-service options let a landlord offer chargers without a large upfront outlay, and the lease then records who owns what. Swift Charging
FAQ
Can a tenant install an EV charger without landlord consent?
No. Tenant works generally need landlord approval under the lease. In a shared car park the landlord will most likely have absolute discretion, so the request should go through a licence for works.
Can a landlord recover EV charger costs through the service charge?
High installation costs are unlikely to be recoverable. Operating costs may be, depending on how the service charge provisions are drafted, so check the wording before installing.
Do I need planning permission to install chargers at a leased commercial site in England?
Mostly not. Since 29 May 2025, EV charge point installations in England generally fall under permitted development rights, with exceptions such as listed buildings and conservation areas, and limits on equipment size and height.
What happens to the chargers when the lease ends?
That depends on the lease. Well-drafted clauses say whether the equipment is removed, retained or transferred, who makes good any damage, and what security backs reinstatement.
Sources
EV charging points at commercial properties: key considerations (TWM Solicitors)
EV Charging points: considerations for landlords (Weightmans)
EV Charging Sites and the Road to 2030 (Beyond Corporate Law)
Demystifying electric vehicle charging points in UK real estate (DLA Piper)
EV Charging Station Business: Legal Checklist (Sprintlaw UK)
What landlords need to know about EVCP leases (RICS Property Journal)
Draft lease template for EVCP, Scottish sites (Scottish Futures Trust)
Commercial chargepoints: minimum technical specification (GOV.UK)
Government looks to slash red tape to make charging electric vehicles at home easier (GOV.UK)
Recommended