A smart meter measures what your whole site draws from the grid. A submeter measures one circuit or device behind it, such as your EV chargers. If you only need to know what the site costs, the smart meter does that job. If you need to know what the chargers cost, or you plan to bill anyone for that electricity, you need a submeter or a charger with approved metering built in. Ofgem’s guide to selling electricity to EV drivers makes the same point: a premises smart meter does not distinguish between the devices consuming, so a secondary meter is needed to measure the EV’s consumption.

 

This guide is for site owners, facilities managers, landlords, managing agents and fleet operators who are planning or upgrading commercial charging. It explains how the two meters differ, when billing triggers certified metering, what “metered” and “unmetered” supply mean, and what to settle before the first charger goes in.



TL;DR

 

  • Smart meter: the supplier’s meter at the grid connection. It bills the whole site and cannot separate EV charging from lighting, heating or machinery.

  • Submeter: a meter on one circuit or charger. It isolates EV consumption for cost allocation, reporting and billing.

  • If you charge by the kWh: the meter must be an appropriate, normally MID-compliant, meter. Metering that is only accurate to within 10% is not enough for billing.

  • Decide at design stage: metering is far easier to specify before installation than to bolt on afterwards.

  • Rules are moving: the VAT treatment of non-domestic EV charging changed on 1 November 2026, and Ofgem is reviewing resale pricing for EV charging.

 

Table of Contents

 

 

What a smart meter does, and what it does not

 

A smart meter is the supplier’s billing meter for your site. According to GOV.UK’s guide for the public sector, smart meters automatically send up to half-hourly consumption data to the supplier, so you are billed on actual use rather than estimates. The same guide explains that the non-domestic market has two types: advanced (AMR) meters, which give minimum usage information, and SMETS meters, which also provide tariff information.

 

Most smaller business sites fall inside the government’s smart metering mandate. The official non-domestic guidance says it covers all electricity sites in profile classes 1 to 4. A profile class is the category your supplier uses to estimate how your site uses electricity across the day. Most non-domestic customers sit in classes 3 and 4.

 

The limitation for EV charging is simple. A smart meter sees one total. When eight chargers start at 8am alongside the air conditioning and the kitchen, the meter records a rise in demand, not who caused it. You can see that the site’s consumption went up. You cannot say what the chargers used, what one driver used or what one tenant should pay.

 

What a submeter does

 

A submeter sits downstream of the main meter. It measures only the load connected to it. For EV charging that usually means one of three arrangements:

 

  1. A meter built into each charger, measuring each connector or session.

  2. A meter on the supply to a group of chargers, for example in a distribution board, measuring the whole charging circuit.

  3. Both, with charger-level readings for individual transactions and a circuit-level reading for site totals and cross-checking.

 

A submeter does not replace your supplier’s meter and does not change what the supplier bills you. It is an additional measurement that you own and use. Ofgem’s guide notes the secondary meter can be part of the EV charger itself, provided it complies with metering regulations. That condition matters, and the next sections explain why.

 

For design and commissioning of building submetering more generally, CIBSE’s TM39 Building Metering and Monitoring is the professional reference. It covers meter accuracy, placement, communications and data export for non-domestic buildings. We also cover the practical side in our guide to EV charging submetering for UK businesses.

 

Smart meter vs submeter at a glance

 

Smart meter

Submeter (circuit level)

Charger with built-in MID meter

Owned and read by

Your supplier

You or your charging provider

You or your charging provider

What it measures

Whole-site import

One circuit or group of chargers

One connector or session

Used for

Supplier billing

Cost allocation, site totals, cross-checking

Per-kWh billing of drivers

Separates EV load from the rest

No

Yes

Yes

Can support billing by the kWh

Not for your own customers

Only if it is certified metering

Only if the meter is certified

Typical sites

Every site

Workplaces, depots, shared car parks

Public, hotel, tenant and pay-per-use charging

When you need certified metering

 

The test is not the size of your site. It is whether anyone is charged by reference to the electricity delivered. Ofgem’s guide, citing Schedule 7 of the Electricity Act 1989, says that where a customer is charged according to the quantity of electricity supplied, the volume must be ascertained by an appropriate meter, and that this is commonly a meter compliant with the Measuring Instruments Directive (MID). MID is the standard that certifies a meter as accurate enough for trade.

 

In practice this means certified metering is the safe route in these situations:

 

  • Public or destination charging where drivers pay per kWh, such as hotels, leisure sites and car parks.

  • Tenant and leaseholder recharging, where a landlord or managing agent passes on the cost of charger electricity.

  • Staff charging with reimbursement by consumption, where employees are repaid or charged for the kWh they use.

  • Billing separate legal entities, for example tenants on a business park or a subsidiary sharing a site.

 

If charging is free to users, or you only allocate costs inside a single organisation for reporting, you are not selling electricity. A circuit-level submeter is still useful there, because it gives you a clean figure for what charging costs you each month.

 

Why a charger’s built-in data is not always enough

 

Every new charger reports energy used. That does not make it billing-grade. The Electric Vehicles (Smart Charge Points) Regulations 2021 require a relevant charge point to measure electricity in watt-hours or kilowatt-hours on each use, and keep any measured figure accurate to within 10% of the actual figure. That is a smart-charging requirement, not a trade-accuracy standard. If a driver or tenant disputes a bill, a reading that may be 10% out is a weak basis.

 

An important practical point: metering is part of the charger specification. The meter is normally built in at manufacture, so the choice is made when you pick the hardware, not later. Our guide to smart charging regulations for site teams sets out the compliance side that sits alongside it.

 

Metered vs unmetered supply

 

The second question people ask is what “metered” and “unmetered” mean. Almost every commercial EV charging site is metered: the supply passes through a meter, and you or your supplier are billed on what it records.

 

Unmetered supply is the exception. Ofgem explains that some street furniture, such as lampposts, is categorised as unmetered, and where chargepoints are attached to it the supply may stay unmetered if the supplier, network operator and customer agree. In that case a special measurement system must be used so that accurate consumption is still recorded and reported into industry settlement. The measurement method also affects cost: National Grid’s charging statement explains that unmetered supplies are allocated to a profile class depending on load type or measurement method, and that profile class allocation affects distribution charges.

 

For most workplaces, depots, hotels, schools and business parks, this is background. You will have a metered supply, with the chargers either behind your existing meter or on a new dedicated connection. Unmetered arrangements mainly concern on-street charging attached to lighting columns.

 

What has changed recently

 

Three developments matter to anyone specifying metering today.

 

VAT and Climate Change Levy. HMRC confirms that from 1 November 2026, electricity supplied through publicly accessible and workplace charge points that employees and contractors can use is not for domestic use for VAT purposes. It is standard-rated unless supplied to a charity for non-business purposes, and is not a domestic supply for Climate Change Levy purposes. Separating EV consumption cleanly makes it easier to evidence what was supplied through the chargers. Speak to your accountant about how this applies to your own accounts.

 

Smart meters in contracts. GOV.UK states that from 1 September 2027 new fixed-term non-domestic energy contracts must include a term that the customer has, or agrees to have, smart or advanced meters installed. Since 1 October 2024, suppliers must also give smaller non-domestic customers with smart or advanced meters free, accessible energy use information. Your main meter is likely to be smart whatever you decide about chargers, which is why the submeter question is about the charging load, not the site.

 

Resale pricing. Ofgem’s October 2025 call for input confirms that the Maximum Resale Price direction made in 2014 excludes electricity resold from a dedicated EV charge point, so a landlord is not capped at cost. Ofgem is reviewing whether that exclusion should continue, because of the growth in EVs since 2014. If you plan to recharge tenants, build your tariff and metering so that you can show the kWh behind every charge, and check Ofgem’s site for the outcome of the review.

 

There is also good news on flexibility. The National Energy System Operator reports that new metering rules mean EV chargers and other devices can take part in flexibility markets using their existing technology, without specialist high-accuracy meters, potentially earning lower tariffs or bill credits. That is about grid services. It does not change the rule that billing a customer by the kWh needs an appropriate meter.

 

Choosing the right metering for your site

 

The right arrangement follows from who pays for the electricity.

 

Workplace and school charging

 

If you absorb the cost or reimburse staff at a flat rate, a circuit-level submeter plus charger software reporting gives you a clear monthly cost. If you charge staff per kWh, specify chargers with certified metering from the start.


Metering options for two workplace payment approaches

Fleet and depot charging

 

Depots draw large, predictable loads overnight. Circuit-level metering shows what the fleet costs per vehicle and per route, and charger-level data shows which vehicles charged when. Certified metering matters if you recharge drivers or sub-contractors for home or depot energy. Load management is also central at depots, because it keeps total demand within your connection. See our guide to EV charging power requirements for how that is sized.

 

Landlords, managing agents and business parks

 

Tenant recharging is where certified metering matters most. Each tenant needs a reading you can defend, so charger-level certified meters with a circuit-level meter for site totals work well. Our article on business park EV charging shows how a shared bay scheme can be laid out.

 

Hotels and destination sites

 

Guests pay per kWh or per session. If you bill by the kWh, certified metering is part of the legal basis for the charge. Add payment and RFID access so that every session is tied to a user.

 

Questions to settle before you specify

 

Before choosing meters, answer these in order:

 

  1. Who pays, and how? Free, flat fee, or by the kWh. This decides whether certified metering is needed.

  2. What does the site’s supply allow? UKPN’s fleet guide recommends early engagement with the network operator and a qualified electrical contractor to check capacity. It gives connection cost ranges from about £1,500 for a single slow-to-fast charge point to £2 million or more for a cluster of rapid units. Timescales run from 8 to 12 weeks for one to three fast chargers or a single rapid charger, to more than 6 months for multiple fast or rapid points.

  3. Can the load be flexible? UKPN describes profiled connections as a non-firm access option for time-flexible loads such as EV charging and depots, trading some curtailment for a faster and cheaper connection. Metering and load management need to be designed together if you go this way. Our guide on the DNO application process covers the steps.

  4. Who needs the data? Finance may want a monthly kWh total, operations may want per-vehicle detail and tenants may want a statement. Choose meters and software that deliver all three.

  5. Who maintains it? Meters, communications and software need to keep reporting accurately for the life of the site.

 

Our commercial EV charging requirements guide walks through the wider site checklist.

 

Getting the metering right with Swift Charging

 

We design, supply, install and manage commercial EV charging infrastructure, from feasibility and site assessment through to system design, installation, commissioning and long-term management. Our offer includes EV charging software and back-office management, payment and RFID solutions, load management and ongoing maintenance, so charger data, access and billing are planned as one system rather than patched together afterwards.

 

If you are planning a new workplace charging installation, a depot, a tenant scheme or a hotel car park, start with a Commercial EV Feasibility Review. It looks at your site and your billing model before any hardware is chosen.


Swiftcharging

For existing chargers that need better reporting, our maintenance and management plans are available at Basic, Standard and Fully Managed levels.

 

Our view on submetering

 

We see the smart meter and the submeter as two tools with two jobs. The smart meter tells your supplier what the site used. The submeter tells you what charging used, and for many sites that is the number that decides whether the project pays back.   The simplest way to avoid trouble is to decide how you will charge before you choose the chargers. If drivers or tenants will pay by the kWh, the hardware, the software and the metering should be chosen together at design stage, because that is when changes cost least. Our approach is to cover feasibility, charger supply and installation, software, payment and RFID, load management and maintenance within one project, so the readings your chargers report line up with the statements you issue.   We also think metering should serve the commercial model, not constrain it. Whether you want a fully funded installation, full ownership, joint investment or charging as a service, the metering plan should show clearly who used what. If grant funding is part of your plan, we can help you check eligibility and apply, so metering and funding are planned in the same conversation.   Swift Charging

 

FAQ

 

Can I use my smart meter to bill drivers or tenants for EV charging?

 

No. The smart meter measures the whole site and cannot separate the chargers from other loads. When you charge by the quantity of electricity supplied, Ofgem’s guide says an appropriate meter must be used, commonly a MID-compliant one. Use certified metering on the charger or its circuit for any per-kWh billing.

 

Does a submeter change my electricity bill?

 

No. A submeter is an additional measurement behind your main meter, and your supplier continues to bill from the main meter. What changes is your visibility: you can see exactly what the chargers cost and allocate or recharge that cost accurately.

 

Do I need a submeter if charging is free for staff?

 

Legally, you are not selling electricity, so certified billing metering is not the issue. A circuit-level submeter is still worthwhile, as it gives you the actual cost of the charging benefit and supports reporting and budgeting.

 

What is the difference between metered and unmetered supply?

 

A metered supply passes through a meter and is billed on recorded use. Unmetered supply applies mainly to street furniture such as lampposts, where consumption is estimated or measured by an approved method and reported into industry settlement. Most workplace, fleet and hotel charging sites are metered.

 

Can I add MID metering to a charger later?

 

Usually not to the charger itself, because metering is part of the charger’s specification. You can add an external certified meter on the charger circuit, but it is simpler and usually cheaper to specify the right metering at the start.

 