A good destination charging strategy matches charger speed to how long people stay, chooses a commercial model before choosing hardware, and checks site power early. Get those three right and your chargers earn their place through longer visits, repeat custom and, where you charge for it, direct revenue. We design, supply, install and manage commercial charging for UK sites, so this guide follows the order we would work through with a hotel, business park, school or retail site.
TL;DR
Destination charging suits places where vehicles stay for an hour or more, so 7kW to 22kW AC points usually fit better than rapid units.
Decide whether charging is free, paid or run by an operator before you pick hardware. The commercial model is the key design decision.
Check grid capacity and use load management early. It can add chargepoints to an existing connection without a costly supply upgrade.
Build in the legal basics: Approved Document S for new buildings, and price and payment rules for public points.
Check grant eligibility before you commit. The Workplace Charging Scheme is currently set at £500 per socket.
Table of Contents
What destination charging is, and where it fits
Destination charging means plugging in at a place where drivers are likely to spend an hour or more, such as a restaurant, hotel, shopping centre, retail park or leisure centre. Speeds are typically mid-range, roughly 7kW to 50kW, according to Dick Lovett’s guide to destination charging. That differs from en-route rapid charging, which is built for short top-ups in the middle of a journey.
The SMMT’s infrastructure position paper describes destination chargers as mostly 7kW to 22kW fast units, with a small number of 50kW rapids, at supermarkets, retail parks, entertainment venues, hotels, tourist sites and public car parks. Ofgem’s guide to selling electricity to EV drivers adds train stations, cinemas, sporting venues and workplaces to the same destination scenario.
For most of our readers, that translates into a handful of site types:
Hotels and hospitality: guests stay for hours or overnight, so a lower-power point fully serves them.
Business parks and offices: employees, tenants and visitors park for a working day.
Schools and leisure sites: staff, parents and event visitors with predictable patterns.
Retail and car parks: shorter stays, where a mix of speeds matters more.
Mixed sites: workplace chargers that also serve visitors out of hours.
The common thread is dwell time. If you know how long people stay, you know most of what you need to know about the right charger.
Match charger speed to dwell time
The most common destination mistake is buying speed nobody needs. A faster charger costs far more to buy and to connect, and a car parked for six hours cannot use the difference.
The UK EVSE Association procurement guide says to select technology and speeds based on site characteristics: expected users, power availability, opening hours, amenities, revenue intent and the connector types common in the market. The SMMT sets the UK power categories as slow at 3kW to 5kW, fast at 7kW to 22kW, rapid at 43kW to 50kW and ultra-rapid at 100kW and above.
Site type | Typical stay | Sensible starting point |
Hotel, overnight guests | 8+ hours | 7kW AC |
Hotel, restaurant and spa visitors | 1 to 4 hours | 7kW to 22kW AC |
Office or business park | 6 to 9 hours | 7kW AC, managed as a group |
School or leisure centre | 1 to 8 hours | 7kW to 22kW AC |
Retail park or supermarket | 30 minutes to 2 hours | Mix of 22kW AC and a few rapids |
This table is our planning guide, not a rule. Your own visitor data should adjust it.
The argument for medium speeds is strong. EV Charging Magazine’s analysis of car park charging says a 22kW point can deliver an 80% charge within a two-hour stay. Even an EV limited to 11kW gains roughly 100 miles in two hours. It also notes that AC installations typically cost less per plug, so a site can deploy more sockets and improve availability. The same article reports that public chargepoints in the 8kW to 49kW range average 59p per kWh, against 74p for rapid and 78p for ultra-rapid.

Two practical points follow. First, availability is a feature: ten 7kW points serve more cars than one 50kW unit. Second, a mix of speeds is worth considering where dwell times vary, because the BVRLA’s guide for attractions lists the correct power for average dwell times, with a mix of speeds, among the things customers want.
Choose the commercial model first
The SMMT notes that it is up to property owners, landlords or car park operators to decide whether destination chargers are free, charge only for the electricity used, or are outsourced to a chargepoint operator for installation, operation and maintenance. That choice shapes everything after it, including the hardware, the software and your cash flow.
Option 1: free or included charging
Free charging works as an amenity. It suits hotels that want to win bookings, and employers who offer it as a benefit. You absorb the electricity cost, so it helps to cap session length or limit access to guests and staff.
Option 2: paid charging
Paid charging recovers electricity cost and can earn a margin. You set a price per kWh, which suits public-facing sites. Ofgem explains that when you resell electricity to a chargepoint operator on your site, that is exempt supply, and that the operator’s resale to the driver is not subject to the Maximum Resale Price. If you run the points yourself and resell electricity, check the Ofgem guide for the rules that apply to your set-up.
Option 3: hosted or operator-run
You provide the space, and an operator funds, runs and maintains the points. We offer this route through hosting chargers on your land or site, including revenue-sharing models for hosts. It suits landowners who want a public service without running it.
Option 4: funded or as-a-service
If upfront capital is the barrier, we offer fully funded installation, full ownership packages, joint investment options and Charging as a Service. The right choice depends on how much control and revenue you want. You can see the options on our commercial EV charging page.
Whichever you pick, treat the return as a whole-site return. Thin electricity margins are only part of it. For a hotel, the gain is bookings and guest satisfaction. For a retail park, it is dwell time and repeat visits. For a business park, it is tenant retention. Our own hotel EV charging guide works through that for hospitality.
Design for the driver’s whole experience
The BVRLA’s attractions guide stresses that the customer experience begins before the vehicle is plugged in. Drivers need to know the access rules, payment methods, fees and enforcement. Its list of what customers want is a usable design brief:
Accessible, well-lit, well-signed chargepoints.
Anti-queue-jumping and non-EV enforcement.
Clear payment terms, including parking and overstay fees.
Contactless payment.
Promotion, pre-booking options and listing on chargepoint mapping apps.
Reliability backed by a maintenance contract and a clear helpline.
Most of these are software and service decisions, not hardware. Payment, RFID access, overstay rules and reporting sit in the management platform, and reliability sits in the maintenance agreement. Our EV charger maintenance plans come in Basic, Standard and Fully Managed tiers, so you can set the level of support to match how public-facing the site is.
Check power and site constraints early
Power is where destination projects most often slip. The IET’s guide to charging infrastructure sets out site assessment criteria: grid capacity, land ownership, accessibility, traffic flows and cellular coverage, with 4G or better needed for chargepoint operation. It also recommends engaging the Distribution Network Operator, the company that runs the local electricity network, at the earliest opportunity, and using its grid-capacity maps for an early indication of spare capacity. These points come from the IET guide to EV charging infrastructure.
The same guide recommends load management, which controls charging power so the site’s connection is never exceeded. That lets you deploy more chargepoints on an existing connection, avoiding or deferring a costly supply upgrade. At a hotel where cars charge overnight, this is often the difference between four points and twelve.
A proper survey looks at the incoming supply, spare capacity, cable routes, parking layout and signal strength before you commit to a number of bays. We cover that in our feasibility study guide, and the commercial EV feasibility review is where we start with a new site. If network capacity is the sticking point, our piece on deferring DNO upgrades explains the options. Design and safety checks are covered in our design standards guide and risk assessment guide.
Rules your chargers must meet
Which rules apply depends on whether the points are public and whether the building is new.
Public chargepoints. GOV.UK’s guidance on the Public Charge Point Regulations 2023 requires prices to be shown in pence per kWh. It requires contactless payment on new public chargepoints of 8kW or above and on existing ones of 50kW or above, unless charging is free. It also sets a 99% annual average reliability requirement across an operator’s rapid network.
New buildings in England. The same guidance says new non-residential buildings with more than 10 parking spaces need at least one chargepoint, plus cable routes for one in five of the remaining spaces. Approved Document S, in force in England since 15 June 2022, sets the minimum standard for those points: 7kW nominal output, a dedicated circuit, a universal untethered socket, a charging status indicator and Mode 3 operation. Installation must comply with BS 7671 and the IET’s code of practice.
If you plan to open your chargers to the public, ask us to confirm which of these apply to your site before the design is fixed. It is far cheaper to specify payment and pricing display at the start than to retrofit it.

What it costs and how to fund it
The published cost ranges below come from a local authority planning note, so treat them as a guide to the scale rather than a quote. Haringey Council’s planning advice note, dated November 2023, gives these figures:
Type | Equipment | Installation | Annual operating and maintenance |
Standard (7kW to 22kW) | £1,600 to £5,000 | £2,500 to £12,000 | £1,900 to £6,500 per unit |
Rapid (43kW AC or 50kW DC) | £20,000 to £50,000 | £25,000 to £30,000 | £1,500 to £2,000 per unit |
The operating figures assume a 60-month service contract. Real costs swing most on cable runs, groundworks and grid work, which is why the survey comes first. Our guides to commercial EV charger installation cost and workplace and fleet installation cost break down what drives the total.
Grants
GOV.UK’s guidance reports that the Workplace Charging Scheme rose from £350 to £500 per socket for installations from 1 April 2026. It covers 75% of costs, up to 40 sockets and a maximum of £20,000, with funding confirmed until 31 March 2027. Check the official scheme page for the current position, and see our OZEV grant eligibility checker to see whether your site qualifies. Where eligible, we help with the application.
Tax
The dedicated 100% first-year allowance for EV chargepoints ended on 31 March 2025 for corporation tax and 5 April 2025 for income tax, and was not extended. Holloway Davies’ capital allowances explainer says customer-facing chargers at hotels and retail parks can still qualify under other capital allowance routes where they are used for the trade. It says allowances cover the unit, cabling, groundworks and installation labour. Confirm your position with your accountant.
A destination charging plan in seven steps
Define who you are serving. Guests, staff, tenants, visitors or the public. This sets access rules and pricing.
Measure dwell time. Use booking data, parking logs or staff patterns. Longer stays point to lower power.
Choose the commercial model. Free, paid, hosted or funded, as above.
Survey the site. Check capacity, cable routes, parking layout and signal. Contact the DNO early.
Size the system. Pick charger speeds and numbers, and plan load management so you can add bays later.
Specify the driver experience. Payment, signage, overstay rules, mapping apps and a support line.
Fund, install and maintain. Apply for any grant before ordering, and set up a maintenance agreement so the points stay available.
We handle steps four to seven from site assessment through to commissioning and long-term management, and we can start from step one with you if the model is still open.
How we can help
Swift Charging designs, supplies, installs and manages commercial charging for UK businesses, from a few workplace points to multi-site destination and public projects. That includes site surveys, AC and DC chargers, management software with payment and RFID, load management, maintenance and grant support. Flexible financing options include zero-upfront and funded models.
Start with our workplace EV charging service if staff and visitors share your car park, or our public EV charging service if you want the points open to everyone. We have teams covering London, Brighton and Chichester, and we work across the UK.

If you are weighing several sites, our commercial EV feasibility review is the practical first step. You can also read more on our destination charging blog.
Our view on destination charging
Destination charging works when it is planned as part of the business, not bolted on as a car park extra. The best projects we see start from the visitor: how long they stay, what they expect to pay and what would make them choose your site next time. That is why we begin with a survey and a conversation about the commercial model. Load management lets us fit more bays onto the power you already have. Management software gives you control of access, pricing and reporting. A maintenance plan keeps every bay working, which drivers notice quickly when it fails. Funding should not be the barrier. Grant support, funded installation, shared investment and Charging as a Service exist so that a site can start with the number of bays it needs and grow. Our aim is to make commercial charging straightforward and commercially viable, from a single hotel to a multi-site estate. Swift Charging
FAQ
What is the best charger speed for destination charging?
For most destinations, 7kW to 22kW AC is the best fit, because cars stay long enough to use that power. A 22kW point can deliver an 80% charge within a two-hour stay, according to EV Charging Magazine’s analysis. Retail sites with short stays may add a few faster units.
Should we charge drivers or offer free charging?
That depends on your goal. Free charging works as a guest or staff benefit, while paid charging recovers electricity costs and can earn a margin. We help set up either, with software that controls access, pricing and reporting.
Do we need a grant to make destination charging viable?
Not always, but it can reduce the upfront cost. The Workplace Charging Scheme is set at £500 per socket for installations from 1 April 2026, subject to eligibility. We also offer funded and as-a-service models for sites that want to avoid upfront spend.
What if our site does not have enough power?
Load management can often add chargepoints to an existing connection without an upgrade, as the IET guide explains. A survey will show your spare capacity and whether the DNO needs to be involved. We cover that as part of site assessment.
Do destination chargers have to accept contactless payment?
New public chargepoints of 8kW or above must offer contactless payment, and so must existing public points of 50kW or above, unless charging is free. Prices must be displayed in pence per kWh. Private points for staff or guests are treated differently, so confirm which rules apply to your site.