EV Charging Backup Power: Options for UK Businesses


Backup power for EV chargers means a second source of electricity, usually a battery energy storage system (BESS), that can supply your chargers when the grid is unavailable or restricted. It does not happen by accident. A battery only keeps chargers running through an outage if the hardware, controls and site wiring are designed for that from the start. For a fleet depot, a hotel or a business park, the right answer depends on how long you can afford to be without charging and which vehicles must always be ready. We design, supply, install and manage commercial charging, so this guide sets out how the decision works and what to settle before you buy.
TL;DR
A battery can supply chosen chargers during an outage or a limited grid connection, but only if the system is specified for backup (islanded) operation. A battery alone does not guarantee it.
Runtime comes from stored energy divided by the load: a 500 kWh battery serving an average 50 kW demand could run for up to 10 hours.
Sizing should follow your real charging pattern, and prioritising critical chargers makes the battery last longer.
In Great Britain, storage counts as generation in law, so connection rules (EREC G98 and G99) apply.
Decide what must stay charged first. Then design the site, the controls and the grid application together.
Table of Contents
What backup power for EV chargers actually means
People use the phrase for three different needs. Mixing them up leads to the wrong equipment.
1. Resilience during a power cut. The site loses mains supply and you want some chargers to keep working. This suits depots where vehicles must leave on time, and sites where charging is part of the service you sell.
2. A buffer for a limited connection. The grid connection is too small for every charger at full power. A battery charges slowly from the grid, then releases that energy quickly to vehicles. This is the most common commercial use and it has nothing to do with outages.
3. A temporary supply while you wait. Some projects wait months for a network upgrade. On-site generation combined with battery storage can be a stopgap, and the IET’s guide to EV charging infrastructure notes that this route can carry carbon, noise and air quality considerations.
The IET guide also says that on-site generation with a battery can, for some sites, cost less overall than upgrading the network connection, and that it lets chargers use locally generated renewable energy. So the same battery can cut your connection costs and give you a degree of resilience, provided you specify both jobs at the outset.

When a UK business needs it
Not every site needs outage cover. These are the situations where it earns its place.
Depots with emergency or time-critical vehicles
Some fleets cannot wait for the grid. A recent report on SP Energy Networks’ battery-buffered fleet charging trial at Middlewich, published by IN Power in September 2026, describes network vehicles that may be called out for fault response and emergency work at short notice. That leaves little tolerance for a charging system that relies on vehicles sitting parked for long periods. The same report is clear that a battery buffer does not remove the need to plan the grid connection, and it does not say the trial runs as an island during a network outage. Buffering and backup are different features.
Hotels, leisure sites and public hosts
If guests or customers pay to charge, a failed supply means lost income and complaints. Keeping even a few chargers live can protect that service.
Workplaces with a constrained supply
Offices, factories and schools often have a connection already close to its limit. A battery softens peaks so you can add chargers without a costly upgrade. Our guide to deferring DNO upgrades on EV charger projects covers that route.
Multi-site operators
When you run several depots, the question is consistency: which sites need outage cover and which need only peak smoothing. Central software helps here, and our piece on charging management across UK fleet sites explains how.
How a battery keeps chargers running
In normal operation, the battery sits between the grid and the chargers. It fills at a modest rate, often overnight or when your own solar is producing, and discharges at a higher rate when vehicles plug in.
During an outage, a switching arrangement disconnects the site from the grid, so the battery does not push power back into the network, and routes it to the chargers you have chosen. Three limits decide what you get:
Energy (kWh): how long it lasts.
Power (kW): how many chargers can run, and how fast.
Control: which chargers are served first.
The US Department of Energy’s battery-buffered charging help sheet gives a useful worked example. A 500 kWh battery with an average charging demand of 50 kW might keep serving drivers for up to 10 hours without grid power. It also states that a battery alone does not guarantee a DC fast charger will operate during a disruption: the hardware and software must be configured for that use. In plain terms, write “must operate when the grid is down” into the design brief, so the inverter, charger controls and site switching are all chosen for it.
Pacific Gas and Electric’s fleet resilience guidebook adds two points. The more power the chargers draw at once, the faster the battery drains and the shorter the runtime. And a battery with no other generation source cannot recharge during an outage. If the outage lasts longer than your stored energy, you need a second source, such as on-site solar able to operate in island mode.
Prioritising chargers
You rarely need every charger. Load management software lets you rank them: vans needed at 6am first, staff cars last, public bays paused. Reducing power to the lower tier stretches the battery. This is where charging software earns its keep, and it is why we treat backup as part of a wider management setup, not a standalone box.
Battery or generator?
A generator can run for as long as it has fuel, but it adds noise, emissions and fuel logistics, and it must be started and maintained. A battery responds instantly, is silent and can also work every day to reduce peak demand. Each suits different outage lengths and sites. We compare the two in detail in battery storage vs diesel generator for commercial EV charging.
Sizing backup power for your chargers
A simple method works for a first estimate.
List the chargers that must stay live in an outage, and their real average draw, not the rating on the box.
Decide the outage window you want to cover: one hour, a shift, a full night.
Multiply the load by the time. Fifty kilowatts for ten hours is 500 kWh, as in the DOE example above. Add a margin for conversion losses and for not draining the battery to zero.
Check the power rating. The inverter must deliver the combined peak of the chargers you want running together, not just the energy total.
Test the result against your real data. Vehicle arrival times, daily mileage, charger utilisation and a reserve for call-outs all decide whether a given battery works at your depot, as the Middlewich trial report notes.
Use half-hourly meter data where you have it. Nameplate figures overstate the load most sites actually draw, and they push you towards an oversized, costlier battery.
Worked example
A delivery depot has 12 van chargers at 11 kW. At peak, 8 vans charge at once, but the average draw across the evening is about 40 kW. The operator wants the six vans that leave first, at 5.30am, to stay charged through an overnight outage of up to eight hours.
Priority load: 6 chargers x 11 kW = 66 kW peak, around 30 kW average once vans reach a high state of charge.
Energy: 30 kW x 8 hours = 240 kWh, before losses and a reserve.
Result: a battery in the low-to-mid hundreds of kWh with an inverter above 66 kW. Pausing the other six chargers is what keeps the numbers this modest.
This is an illustration of method with round numbers, not a quote. A real design uses your meter data and your vehicle schedule.
Why smart charging comes first
Battery size follows demand, so reducing peak demand reduces the battery you need. A University of Reading techno-economic study, using 2021 UK half-hourly wholesale prices, found depot energy delivery cost fell from 18.32 to 11.90 p/kWh when managed charging replaced on-demand charging. It also found a non-linear relationship between battery capacity, charger rating and delivered price, so doubling the battery does not double the benefit. Our guides on smart charging for fleets and a depot-first charging strategy show how to flatten the load before you specify storage.
For heavy goods vehicles the numbers grow quickly. National Highways’ truckstop operator guidance notes that UK electric HGVs carry 400 to 700 kWh batteries, that faster charging needs a bigger grid connection and more expensive electrical infrastructure, and that electricity cost is driven by energy in kWh, not power. For an HGV depot, storage sizing needs particular care.

Site and electrical checks before you commit
Switching and transfer equipment
The PG&E guidebook describes the site hardware that lets backup power connect quickly and safely: quick-connect ports, a manual transfer switch that disconnects the facility from the grid and routes backup power to the chargers, and switchgear sized for the backup source. An automatic transfer switch detects the outage and reconnects the site when mains power returns. Those are US utility examples, but the principle holds in the UK: the site must be isolated from the grid before the battery feeds the chargers.
Grid connection rules in Great Britain
Battery storage is classed in GB law as a form of generation. UK Power Networks’ 2026 Distributed Generation Connection Guide explains that the technical and compliance requirements for storage were revised in the engineering recommendations EREC G98 and G99 from September 2022. It also states that storage devices installed after March 2026 must, when importing, switch to export mode if system frequency falls below a defined threshold. In practice, a battery needs to be notified to or approved by your distribution network operator (DNO), the company that runs the local grid, and the equipment must meet the current settings. Our DNO application guide sets out the process and typical timescales.
Network stability
Large groups of chargers can affect the grid. The Energy Systems Catapult report Resilient Electric Vehicle Charging, published in February 2022, identifies risks including tariff-driven steps in demand, software errors and many chargers switching on or off within minutes. Staggered start-up and well-configured controls reduce these effects, which is another reason backup and load management belong in one design.
Design standards
Charger layout, cabling, protection and signage all have to meet UK requirements, and a battery adds fire-safety and ventilation considerations to the site plan. Our overview of EV charging design standards for UK commercial sites is a good place to start your checklist.
Costs and running considerations
Backup power is a capital cost with running costs attached. The main elements are:
Battery and inverter: the largest item, scaling with energy and power.
Switching, protection and civil works: transfer equipment, plinths, cabling and fire-safety measures.
Grid application: the DNO process and any studies it requires.
Software and monitoring: to rank chargers, track state of charge and report faults.
Maintenance: a battery and its switching are only useful if they are known to work, so inspection and fault response matter.
The offset is on the other side of the ledger. A battery that smooths peaks can reduce the connection capacity you need, and one paired with solar can store your own generation for charging. Whether that pays back depends on your tariff, your demand pattern and your site, which is why we do not quote generic figures. A feasibility review with real data gives you a number you can take to your finance team.
What we do about it
Backup power is one part of a charging project, and it works best when the survey, the design, the software and the grid application are handled together. We take businesses from initial feasibility and site assessment through system design, installation, commissioning and long-term management. Our charging software and load management let you prioritise chargers, and our energy team can assess complementary solar PV, battery storage and heat pumps for your site.
If you are planning new chargers, expanding an installation or migrating existing chargers onto a modern management platform, we can include the resilience question in the survey. Where you qualify, we also help with applications for government EV charging grants through OZEV (the Office for Zero Emission Vehicles), and you can check your grants eligibility before you commit to a budget.
Our maintenance plans (Basic, Standard and Fully Managed) cover ongoing support for installed chargers, so the equipment you rely on in an outage is looked after in normal times too. See EV charger maintenance services.
Start with a feasibility review
The cheapest way to get backup power wrong is to buy a battery before you know your load. Our commercial EV feasibility review looks at your site, your vehicles and your supply, so you know whether you need outage cover, peak buffering or both. For fleet sites, see our fleet EV charging solutions, and for energy and storage options, our energy solutions for businesses.

We also offer funded and flexible models, including fully funded installation, full ownership packages, joint investment options and charging as a service, so resilience does not have to mean a large upfront outlay. Tell us about your site through Swift Charging and we will take it from there.
Our perspective on backup power
We start every resilience conversation with one question: which vehicles, or which customers, must you never turn away? Most sites find the answer is a handful of chargers, not all of them. That changes the size, and the cost, of the battery you need. We also see backup as part of the charging system, not an accessory to it. A battery, the charger controls, the switching and the grid application have to be designed together, because a battery alone does not guarantee chargers work when the grid is down. Load management software is what lets a modest battery protect the chargers that matter. Our approach is to survey first, use your real charging pattern, and design storage, solar and charger management as one scheme. Where the connection is the constraint, a well-placed battery can defer a costly network upgrade. Where outage cover is the priority, the same equipment can be specified for it. That is how we make commercial charging straightforward, reliable and commercially viable. Swift Charging
FAQ
Can a battery keep my EV chargers running in a power cut?
Yes, if the system is designed for it. The battery, inverter, switching and charger controls must all support running without the grid, and the battery must hold enough energy for the chargers you choose to keep live. A 500 kWh battery serving an average 50 kW load could run for up to 10 hours, according to a US Department of Energy example.
How big a battery do I need?
It depends on the load you must protect and for how long. Multiply the average charging demand of your priority chargers by the hours of cover you want, then add a margin for losses and a reserve. Real meter data and your vehicle schedule give a far better result than charger nameplate ratings.
Do I need DNO approval for a battery at my site?
In Great Britain, storage is classed as generation, so it falls under the EREC G98 and G99 connection rules and your DNO needs to be involved. Requirements were revised from September 2022, and storage installed after March 2026 has extra frequency-response behaviour. Your installer should manage the application with you.
Is a battery the same as backup power?
No. Many batteries at charging sites are buffers that reduce the grid connection you need, and they do not supply the site during an outage. Ask for islanded operation explicitly if outage cover matters to you.
Can I get a grant towards workplace charging?
Where you are eligible, government schemes administered through OZEV can reduce installation costs. We help businesses identify and apply for them, and you can start with our grants eligibility page.
Sources
Battery Energy Storage for Electric Vehicle Charging (US Department of Energy help sheet)
EV Resilient Fleets: A Guidebook to EV Fleet Resiliency (PG&E)
Electric Vehicle Charging Infrastructure for Local Authorities (IET)
SP Energy Networks expands battery-buffered fleet charging (IN Power)
Truckstop operator guidance for eHGV charge point (National Highways)
An integrated techno-economic approach for design and operation (University of Reading)
Resilient Electric Vehicle Charging (Energy Systems Catapult)