Public vs Private EV Charging: Which Suits Your Business?


For a UK business, the difference between public and private EV charging comes down to one question: who is the charge point for? If it serves your staff, fleet and workplace visitors, it is private. If it is intended primarily for the general public, it is public, and a separate set of legal duties applies. Most sites choose private charging for the vehicles they control and add public access only where passing customers, tenants or landowners create a commercial case. We design, supply, install and manage both, so the decision can follow your site rather than a product list.
TL;DR
A charge point is public if it is intended primarily for general public use, including in a privately owned car park open to the public. Workplace points for employees, contractors and visitors who are not buying anything are not public.
Private charging (workplace and depot) suits vehicles that return to base. It is the lower-cost way to charge and the one that grant funding is built around.
Public access suits hotels, leisure sites, retail and landowners who want to serve visitors and earn revenue. It brings operator duties such as reliability and a 24-hour helpline.
The Workplace Charging Scheme covers up to 75% of costs, capped at £500 per socket, for installations completed up to 31 March 2027.
Many sites do both: private bays for staff and fleet, public bays for visitors, run from one management platform with load management.
Table of Contents
What counts as public and what counts as private
The law draws the line, not the sign on the bay. Under the Public Charge Point Regulations 2023, a public charge point is one intended primarily for general public use. That includes points in privately owned car parks open to the public and points that can only be used at certain hours. Workplace charge points that are inaccessible to the public and intended solely for employees, contractors and workplace visitors who are not purchasing goods or services are excluded.
The government’s guidance on the regulations adds that the requirements for public points vary with power, deployment date and whether the point is free to use, and that micro-businesses are exempt from most requirements other than those on pricing.
The market is usually split the same way. The UK Infrastructure Bank’s EV charging strategy update describes private charging as at-home and workplace charging, normally slower and cheaper, funded by households and businesses. Public charging covers hub, on-street, destination and en-route sites. Destination charging at retail, leisure and hotel sites is typically slower than 22kW, while hubs offer rapid and ultra-rapid chargers above 50kW.

A quick way to classify your own site
Ask three things:
Who can park there? A gated staff car park or depot is private. A customer car park, hotel forecourt or business park visitor area is likely to be public.
Who is the charger meant for? If members of the public can plug in without being an employee or contractor, treat it as public.
When can it be used? Restricted hours do not make a public point private.
If a mixed car park leaves you unsure, we can review it as part of a commercial EV feasibility review before you commit to hardware.
Public vs private charging at a glance
Private (workplace, depot) | Public (destination, hub) | |
Who uses it | Staff, fleet vehicles, contractors, non-buying visitors | Any EV driver |
Typical speed | Mostly AC, slower and cheaper | Destination AC, or rapid and ultra-rapid DC at hubs |
Who pays for the hardware | The business, with grant support where eligible | The site owner, an operator, or a shared or funded model |
Income | Cost control, staff benefit, fleet readiness | Charging fees, revenue share or hosting income |
Regulation | Excluded from the public charge point rules | Covered by the Public Charge Point Regulations 2023 |
Management needs | Access control, scheduling, load management | Payment, uptime, helpline, reporting, pricing display |
When private charging is the right answer
If your vehicles come back to the same place every day, private charging is the starting point. The IET’s guidance on fleet infrastructure states that work-based or depot-based charging improves EV practicality in almost all fleet cases. The same guidance notes that public rapid charging is more expensive than charging at base or at home, and that availability may not be guaranteed.
That applies to several of the sites we work with:
Fleets and logistics operators. Vans and cars park overnight, so slower AC charging fits the duty cycle. Our fleet EV charging work covers depot design, charging software and load management.
Offices, manufacturers and schools. Staff who cannot charge at home, for instance because they have no off-street parking, can charge during the working day. The IET notes that home charging is difficult for staff without off-street parking, which makes workplace charging a real benefit.
Facilities managers. Private bays let you decide who has access, at what times and at what price, including free or reduced-rate charging for employees.
If this is your route, see our workplace EV charging page.
Why grants point towards private charging
The Workplace Charging Scheme is open until 31 March 2027. It covers up to 75% of purchase and installation costs including VAT, capped at £500 per socket and 40 sockets per applicant. From 1 April 2026 the maximum rate rose from £350 to £500 per socket for installations completed on or after that date, and this is the scheme’s final year.
Eligible applicants include businesses, charities, public sector organisations and small accommodation businesses. The site needs dedicated off-road parking, evidenced for staff or fleet use, and the work must be done by an authorised installer. State-funded education institutions have a separate scheme with a different grant amount.
The installer guidance, last updated 1 April 2026, lists eligible spend as the chargepoint unit, electrical components, civil engineering, installation labour, hardware, site survey works and customer VAT. Ongoing back-office data, maintenance, warranty extensions beyond three years and other running costs are excluded. Installations must meet BS EN 61851, BS 7671 and the IET Code of Practice, with a three-year on-site warranty.
Because the running costs sit outside the grant, it pays to plan maintenance and software at the same time as the install. We help eligible businesses identify and apply for grants. Our guides to the Workplace Charging Scheme and EV infrastructure grants explain the application, and you can check your eligibility first.

When public access makes commercial sense
Public charging is a different proposition. You are not just powering your own vehicles, you are offering a service to anyone who arrives. That suits:
Hotels and hospitality sites, where guests and diners stay for hours and destination charging adds to the stay.
Leisure venues and visitor attractions, where dwell time is long.
Business parks and commercial landlords, serving tenants and visitors together.
Landowners with a well-placed site, who want to host chargers rather than run them. Our host an EV charging site and public EV charging services cover this, including revenue-sharing models for hosts and options such as fully funded installation, full ownership and joint investment.
Destination sites tend to use slower chargers because drivers stay for a while. Our destination charging articles go through what suits each type of venue.
The duties that come with public points
Opening a charger to the public means meeting the operator rules. The regulations require, for example, that a network of rapid charge points is on average 99% reliable over each calendar year, and that operators provide a free, staffed telephone helpline open 24 hours a day, with the number displayed on or near the charge point and quarterly reports submitted to the Secretary of State. Our guide to the public charge point regulations sets out what operators must do.
These are exactly the tasks a managed service takes off a site owner. Software and back-office management, payment and RFID systems, and ongoing maintenance and support are part of what we provide, so a hotel or landlord does not have to build an operations team to open its car park to drivers.
Costs: who pays for what
The cost picture differs by model, and it helps to separate three layers.
1. Installation. Charger hardware, electrical work, civil engineering and commissioning. For private workplace and depot sites this is where the Workplace Charging Scheme helps. Costs vary a great deal by site, depending on cable runs, groundworks and the number of bays, which is why we start with a site assessment rather than a standard price.
2. Grid capacity. The IET advises that more than about 10 standard or fast chargers, or more than one rapid charger, can require a distribution network operator (DNO) upgrade. The DNO is the company that runs the local electricity network, and the guidance is to contact it early. Public rapid hubs are the most likely to trigger this, which is a strong reason to settle your charging mix before applying for a connection. Load management, which shares the available power between chargers, can help a site stay within its supply.
3. Operation. Electricity, software fees, maintenance and support. In a private setup you carry these, though you can recover them through pricing if you charge drivers. In a public setup, charging fees and revenue-share income can offset them. Our models include flat-fee charging as a service, as well as funded and joint-investment options, so the capital outlay does not have to be the barrier.
For both models, our EV charger maintenance plans (Basic, Standard and Fully Managed) keep the equipment working after commissioning.
Managing a mixed site
Many sites do not choose one or the other. A hotel might reserve some bays for staff and run others for guests. A business park might offer tenants private access and open the rest to visitors. A fleet depot might make spare capacity available to the public outside operating hours.
The IET’s point on information applies directly. It notes that understanding drivers’ state of charge and when charging is needed allows charging management systems and user policies to be developed, and that unmanaged non-critical charging can consume grid capacity needed for essential journeys. On a mixed site, that means:
Separate access rules for staff, fleet and public bays, set in the charging software.
RFID or payment options matched to each user group.
Load management so visitor charging never starves the fleet that needs to leave at 6am.
One back office, so reporting, billing and fault handling are not split across systems.
If you already have chargers, we can also help you replace outdated units or move existing chargers onto a modern management platform.
A simple decision path
List who needs to charge: fleet vehicles, staff, tenants, guests, passing drivers.
Check where they park: off-street and dedicated, or open to everyone.
Estimate your power need and discuss the supply with your DNO early.
Match the model: private for controlled vehicles, public for visitors and revenue, mixed where both exist.
Check grant eligibility before you order hardware, and use an authorised installer if you plan to claim.
Plan operations: software, payment, maintenance and, for public points, the regulatory duties.
Our view
We see public and private charging as two jobs on the same site rather than rival choices. Private bays make a fleet or workforce ready for electric vehicles, and the grant landscape is built around that use. Public bays turn a car park into a service that visitors value and, for hosts, a source of income. What makes either work is the management behind it. Smart charger software, load management, payment and RFID, and maintenance cover let a site run reliably without handing the job to a facilities team that has other priorities. Where solar PV or battery storage suits a site, we can assess those alongside the chargers, so the charging load and the energy supply are planned together. Our approach is to start with the site: its parking, its supply, who needs to charge and what funding is available. Then we design, install, commission and manage the answer, from a small workplace installation to a multi-site rollout. Swift Charging
Plan your site with Swift Charging
Whether you need private bays for staff and vehicles, public charging for visitors, or both, we handle the survey, design, installation, commissioning and long-term management. We can also help you apply for available UK grants, and we offer zero-upfront and funded models for suitable sites.

Start with a commercial EV feasibility review, or explore our commercial EV charging solutions to see which model fits your site. Our pages cover installation across the UK, including London, Brighton and Chichester.
FAQ
Is a workplace charger a public charge point?
Not if it is inaccessible to the public and intended solely for employees, contractors and workplace visitors who are not purchasing goods or services. Those points are excluded from the Public Charge Point Regulations 2023. If customers or other drivers can use it, treat it as public.
Can I open private chargers to the public later?
Yes, in principle, and many sites run a mixed arrangement. Once points are intended primarily for the public, the public charge point rules apply, so it is best to plan payment, access control and operations from the start. Our software and management services are built for this.
Do grants cover public charging?
The Workplace Charging Scheme is aimed at staff and fleet use, with dedicated off-road parking evidenced for that purpose. It covers up to 75% of costs, capped at £500 per socket, until 31 March 2027. For other funding routes, our grants team can review your site.
Do I need a grid upgrade?
It depends on the number and power of the chargers. The IET advises that more than about 10 standard or fast chargers, or more than one rapid charger, can require a DNO upgrade, so contact the DNO early. A site assessment will show where you stand.